EDCO logo

EDCO Public Information Centre (PIC) #1

The purpose of this PIC was to present the design and solicit feedback on the Project, including:

  • Rehabilitation of the Existing QEW/Credit River Bridge
  • Active Transportation crossing of the Credit River and Stavebank Creek
  • Landscape Design
  • Detail Design Refinements

The format for the Virtual PIC was as follows:

  1. Presentation Video – Available on this page as of August 5, 2021 9:00AM
  2. The virtual PIC Q&A – August 5, 2021 from 4:00PM to 6:30PM*

If you were unable to join the virtual PIC, you can still view the materials online.

The following PIC #1 materials are available for review:

Virtual PIC#1 Summary Report

Please click on the following link to read the PIC Summary Report.

PIC#1 Summary Report