Traffic Impacts

We apologize in advance for any inconvenience or delays any traffic impacts may cause during construction on this important infrastructure project.  

Please plan ahead and drive according to the road conditions. Stay alert, stay safe, and slow down.

Click the road name under Impact Locations or scroll down for specific project traffic impacts.

Impact Locations

Marine Notification: Credit River Public Water Way

1. Credit River Public Water Way Restriction

Location:

Credit River at the QEW Credit River Bridge

Dates: May 01 to July 01, 2025

Purpose: Overhead Construction for the QEW Credit River Twin Bridge

Description:

  1. Between Thursday May 01 to Friday June 06, access will be maintained through either the East Side of Credit River, the West Side of Credit River, or Portage Route (West Bank)
  2. Between Friday June 06 to Monday June 30, access will be maintained through either the East side of the Credit River or the West side of the Credit River.
  3. Credit river will be fully open Tuesday July 1

Impact:

  • Construction activities for the bridge foundation and finishing works
  • Construction of the East-West Pedestrian-Cyclist crossing
  • Major water navigation impacts to rowers, paddlers and public
  • Minor noise impacts are anticipated
  • Work will be weather dependent 

Multi-Use Path

No scheduled disruptions at this time.

QEW

1. Full Ramp Closure

Mississauga Road on-ramp to QEW Eastbound

Location:

QEW Eastbound on-ramp at Mississauga Road

Date/Time: Monday July 31, 2023 to TBD

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Full closure of the QEW Eastbound on-ramp at Mississauga Road.

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

2. Nightly Lane Closures and Nightly Ramp Closures

QEW Westbound Between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Mississauga Road

Dates: Sunday May 25 to Sunday June 22, 2025

Times: 11:00PM to 9:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound between Hurontario Street and Erin Mills Parkway

Alternating two lane closure of QEW Westbound between Hurontario Street and Erin Mills Parkways

Sunday June 1 to Friday June 6

  • Two Lanes: 11:00PM to 5:00AM

Tuesday June 10 to Thursday June 12

  • Two Lanes: 11:00PM to 5:00AM

Friday June 6, 13, 20 and Saturday June 7, 14, 21

  • Two Lanes: 11:00PM to 9:00AM
 

2. QEW Westbound Off-ramp to Mississauga Road

Full Closure

  • 11:00PM to 9:00AM
  • Scheduled Dates: Saturday June 7, Friday June 13, Saturday June 14, and Saturday June 21
 

3. QEW Westbound On-ramp from Mississauga Road

Full Closure

Weeknights (Sunday to Thursday)

  • Full closure from 11:00PM to 9:00AM on Friday June 6, Saturday June 7, Friday June 13, Saturday June 14, and Saturday June 21

  • Full closure from 11:00PM to 5:00AM on Tuesday June 10, Wednesday June 11 and Thursday June 12

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

3. Two Lane Closures

QEW Westbound between Hurontario Street and Erin Mills Parkway & QEW Eastbound Between Erin Mills Parkway and Hurontario Street.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Eastbound between Erin Mills Parkway and Hurontario Street

Dates: Wednesday June 11 to Monday June 30

Times: 10:00PM to 8:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway 

Monday – Thursday Nights

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM
 

2. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mill Parkway to Hurontario Street  

Monday – Thursday Nights

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM
 

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

4. Two Lane Closure and Ramp Closure

QEW Westbound between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Hurontario Street.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Hurontario Street

Dates: Wednesday June 18 to Thursday June 19, 2025

Times: 10:00PM to 6:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM
 

2. QEW Westbound Off-ramp to Mississauga Road

Full closure of QEW Westbound Off-ramp to Mississauga Road

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday June 19
 

3. QEW Westbound On-ramp from Hurontario Street

Full Closure of QEW Westbound On-ramp from Hurontario Street for 1 hour between Midnight and 5:00AM

  • Scheduled Dates: Thursday June 19

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

5. Two Lane Closure and Ramp Closure

Mississauga Road between the QEW On and Off ramps at Mississauga Road and North of Mississauga crescent. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

Location:

  1. Mississauga Road
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Mississauga Road

Dates: Monday June 16 to Friday June 20, 2025

Times: 7:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. Mississauga Road

Alternating one lane closure on Mississauga Road between the QEW On and Off ramps at Mississauga Road and North of Mississauga Crescent

  • 7:00PM to 5:00AM
  • Scheduled Dates: Monday June 16, Tuesday June 17, Wednesday June 18, and Thursday June 19
  • Two-way traffic will be maintained at all times under flagging conditions
 

2. QEW Westbound Off-ramp to Mississauga Road

One lane closure and Full Closure

  • One lane closure from 8:00PM to 5:00AM on Monday June 16, Tuesday June 17, Wednesday June 18 and Thursday June 19
  • Full closure from Midnight to 5:00AM on Monday June 16, Tuesday June 17, Wednesday June 18 and Thursday June 19
 

3. QEW Westbound On-ramp from Mississauga Road

Full Closure

  • Full closure from Midnight to 5:00AM on Monday June 16, Tuesday June 17, Wednesday June 18 and Thursday June 19

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

Premium Way

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday June 02 to Monday June 30, 2025

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Stavebank Road

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday June 02 to Monday June 30, 2025

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Dickson Road

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday June 02 to Monday June 30, 2025

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Hurontario Street

1. Two Lane Closure and Ramp Closure

QEW Westbound between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Hurontario Street.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Hurontario Street

Dates: Wednesday June 18 to Thursday June 19, 2025

Times: 10:00PM to 6:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM
 

2. QEW Westbound Off-ramp to Mississauga Road

Full closure of QEW Westbound Off-ramp to Mississauga Road

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday June 19
 

3. QEW Westbound On-ramp from Hurontario Street

Full Closure of QEW Westbound On-ramp from Hurontario Street for 1 hour between Midnight and 5:00AM

  • Scheduled Dates: Thursday June 19

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

Lynchmere Avenue

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday June 02 to Monday June 30, 2025

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Mississauga Crescent

No Scheduled Disruptions at this time

Mississauga Road

1. Single and Two-Lane Closures

Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road. South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

—UPDATED—

Location:

  1. Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road.
  2. South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

Dates: Sunday June 01 to Monday June 30, 2025

Times: 8:00PM to 5:00AM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

1. Mississauga Road

One lane closure of Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to and from Mississauga Crescent and Kedleston Way will be maintained at all times
  • No closures to occur on weekends
 

2. South Sheridan Way

Two-lane closure of South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road

  • 8:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • No Closures to occur on weekends

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

2. Nightly Lane Closures and Nightly Ramp Closures

QEW Westbound Between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Mississauga Road

Dates: Sunday May 25 to Sunday June 22, 2025

Times: 11:00PM to 9:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound between Hurontario Street and Erin Mills Parkway

Alternating two lane closure of QEW Westbound between Hurontario Street and Erin Mills Parkways

Sunday June 1 to Friday June 6

  • Two Lanes: 11:00PM to 5:00AM

Tuesday June 10 to Thursday June 12

  • Two Lanes: 11:00PM to 5:00AM

Friday June 6, 13, 20 and Saturday June 7, 14, 21

  • Two Lanes: 11:00PM to 9:00AM
 

2. QEW Westbound Off-ramp to Mississauga Road

Full Closure

  • 11:00PM to 9:00AM
  • Scheduled Dates: Saturday June 7, Friday June 13, Saturday June 14, and Saturday June 21
 

3. QEW Westbound On-ramp from Mississauga Road

Full Closure

Weeknights (Sunday to Thursday)

  • Full closure from 11:00PM to 9:00AM on Friday June 6, Saturday June 7, Friday June 13, Saturday June 14, and Saturday June 21

  • Full closure from 11:00PM to 5:00AM on Tuesday June 10, Wednesday June 11 and Thursday June 12

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

3. Two Lane Closure and Ramp Closure

QEW Westbound between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Hurontario Street.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Hurontario Street

Dates: Wednesday June 18 to Thursday June 19, 2025

Times: 10:00PM to 6:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM
 

2. QEW Westbound Off-ramp to Mississauga Road

Full closure of QEW Westbound Off-ramp to Mississauga Road

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday June 19
 

3. QEW Westbound On-ramp from Hurontario Street

Full Closure of QEW Westbound On-ramp from Hurontario Street for 1 hour between Midnight and 5:00AM

  • Scheduled Dates: Thursday June 19

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

4. Two Lane Closure and Ramp Closure

Mississauga Road between the QEW On and Off ramps at Mississauga Road and North of Mississauga crescent. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

Location:

  1. Mississauga Road
  2. QEW Westbound Off-ramp to Mississauga Road
  3. QEW Westbound On-ramp from Mississauga Road

Dates: Monday June 16 to Friday June 20, 2025

Times: 7:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. Mississauga Road

Alternating one lane closure on Mississauga Road between the QEW On and Off ramps at Mississauga Road and North of Mississauga Crescent

  • 7:00PM to 5:00AM
  • Scheduled Dates: Monday June 16, Tuesday June 17, Wednesday June 18, and Thursday June 19
  • Two-way traffic will be maintained at all times under flagging conditions
 

2. QEW Westbound Off-ramp to Mississauga Road

One lane closure and Full Closure

  • One lane closure from 8:00PM to 5:00AM on Monday June 16, Tuesday June 17, Wednesday June 18 and Thursday June 19
  • Full closure from Midnight to 5:00AM on Monday June 16, Tuesday June 17, Wednesday June 18 and Thursday June 19
 

3. QEW Westbound On-ramp from Mississauga Road

Full Closure

  • Full closure from Midnight to 5:00AM on Monday June 16, Tuesday June 17, Wednesday June 18 and Thursday June 19

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

North Sheridan Way

No scheduled disruptions at this time.

South Sheridan Way

1. Single and Two-Lane Closures

Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road. South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

—UPDATED—

Location:

  1. Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road.
  2. South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

Dates: Sunday June 01 to Monday June 30, 2025

Times: 8:00PM to 5:00AM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

1. Mississauga Road

One lane closure of Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to and from Mississauga Crescent and Kedleston Way will be maintained at all times
  • No closures to occur on weekends
 

2. South Sheridan Way

Two-lane closure of South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road

  • 8:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • No Closures to occur on weekends

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

—UPDATE—

Location:

South Sheridan Way between Gallant Drive and the QEW Eastbound Off-ramp to South Sheridan Way

Dates: Wednesday June 11 to Monday June 30, 2025

Times: 8:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

South Sheridan Way

One lane closure of South Sheridan Way between Gallant Drive and the QEW Eastbound Off-ramp to South Sheridan Way

  • 8:00PM to 5:00AM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Gallant Drive and Indian Grove will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

Kedleston Way

No scheduled disruptions at this time.

Knareswood Drive

No scheduled disruptions at this time.

Erin Mills

No scheduled disruptions at this time.