Traffic Impacts

We apologize in advance for any inconvenience or delays any traffic impacts may cause during construction on this important infrastructure project.  

Please plan ahead and drive according to the road conditions. Stay alert, stay safe, and slow down.

Click the road name under Impact Locations or scroll down for specific project traffic impacts.

Impact Locations

Marine Notification: Credit River Public Water Way

1. Credit River Public Water Way Restriction

Location:

Credit River at the QEW Credit River Bridge

Dates:

May 01 to July 01, 2025

Purpose:

Overhead Construction for the QEW Credit River Twin Bridge

Description:

  1. Between Thursday May 01 to Friday June 06, access will be maintained through either the East Side of Credit River, the West Side of Credit River, or Portage Route (West Bank)
  2. Between Friday June 06 to Monday June 30, access will be maintained through either the East side of the Credit River or the West side of the Credit River.
  3. Credit river will be fully open Tuesday July 1

Impact:

  • Construction activities for the bridge foundation and finishing works
  • Construction of the East-West Pedestrian-Cyclist crossing
  • Major water navigation impacts to rowers, paddlers and public
  • Minor noise impacts are anticipated
  • Work will be weather dependent 

Multi-Use Path

No scheduled disruptions at this time.

QEW

1. Full Ramp Closure

Mississauga Road on-ramp to QEW Eastbound

Location:

QEW Eastbound on-ramp at Mississauga Road

Date/Time:

Monday July 31, 2023 to TBD

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Full closure of the QEW Eastbound on-ramp at Mississauga Road.

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

2. Two Nightly Lane Closures

QEW Westbound & Eastbound between Erin Mills Parkway and Hurontario Street

—UPDATE—

Location:

QEW

  • QEW Eastbound between Erin Mills Parkway and Hurontario Street
  • QEW Westbound between Hurontario Street and Erin Mills Parkway 

Dates:

Friday May 16 – Friday May 30, 2025

Times:

10:00PM to 8:00AM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

QEW Eastbound Lanes

Two lane closure of QEW Eastbound between Erin Mill Parkway and Hurontario Street  

Monday to Thursday Night

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM
 

QEW Westbound Lanes

Two lane closure of QEW Westbound between Hurontario Street and Erin Mills Parkway 

Monday to Thursday Night

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

Impact:

  • No Closures to take place from 5:00AM Friday May 16 to Tuesday May 20, 10:00PM
  • Traffic Disruptions are anticipated
  • Overnight Construction activities may produce noise
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above
  • Signed detour will be set up for off-ramp closures

3. Full Ramp Closure

Mississauga Road between North Sheridan Way and South Sheridan Way.

Location:

QEW Westbound Off-Ramp to Mississauga Road

Date/Time:

Friday May 23 to Sunday May 25

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

  1. QEW Westbound Off-ramp to Mississauga Road

     Full Closure of the QEW Westbound Off-ramp to Mississauga Road

    • Saturday May 24, at midnight until Sunday May 25, at 5:00AM

 

  1. Mississauga Road between North of the QEW Westbound on and off ramps at Mississauga Road to North of Mississauga Crescent

     Alternating single lane closure on Mississauga Road, North of the QEW         Westbound on and off ramps at Mississauga Road to North of                         Mississauga Crescent

    • 9:00PM to 5:00AM
    • Scheduled Dates: Friday May 23 to Sunday May 25
    • Two way traffic will be maintained at all times under flagging conditions
  •  

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

4. Two Lane Closure and Ramp Closure

QEW Eastbound between Erin Mills Parkway and Hurontario Street. QEW Eastbound Off-ramp to South Sheridan Way.

Location:

  1. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  2. QEW Eastbound Off-ramp to South Sheridan Way

Dates: Tuesday May 20 – Thursday May 22, 2024

Times: 10:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

 

  1. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mills Parkway to Hurontario Street. 

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

 

  1. QEW Eastbound Off-ramp to South Sheridan Way

Full closure of QEW Eastbound Off-ramp to South Sheridan Way.

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday May 22

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

5. Two Lane Closure and Ramp Closure
QEW Westbound between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road.

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road

Dates: Tuesday May 20 – Friday May 23, 2025

Times: 11:00PM to 6:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

  1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway 

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

 

  1. QEW Westbound Off-ramp to Mississauga Road

Full closure of QEW Westbound Off-ramp to Mississauga Road

  • Midnight to 5:00AM
  • Scheduled Dates: Friday May 23

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

6. Ramp Closure
QEW Eastbound Off-ramp to South Sheridan Way

Location:

QEW Eastbound Off-ramp to South Sheridan Way

Dates: 

Wednesday May 28 to Tuesday June 03, 2025

Times: 

Midnight to 5:00AM

Purpose: 

Ongoing QEW Credit River Improvement Project

Description:

QEW Eastbound Off-ramp to South Sheridan Way

Full Ramp Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Wednesday May 28, Thursday May 29, Friday May 30, Monday June 02, and Tuesday June 03
  • No closures to occur on weekends

 

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

Premium Way

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

-UPDATE-

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates:

Thursday May 01 to Thursday May 29 2025

Times:

9:00AM to 3:00PM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays
  • No closures to occur on May 19

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Stavebank Road

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

-UPDATE-

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates:

Thursday May 1 to Thursday May 29 2025

Times:

9:00AM to 3:00PM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays
  • No closures to occur on Monday May 19

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Dickson Road

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

UPDATE-

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates:

Thursday May 01 to Thursday May 29 2025

Times:

9:00AM to 3:00PM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays
  • No closures to occur on Monday May 19 2025

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Hurontario Street

No scheduled disruptions at this time.

Lynchmere Avenue

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

-UPDATE-

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates:

 Thursday May 1 to Thursday May 29 2025

Times:

9:00AM to 3:00PM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays
  • No closures to occur on Monday May 19 2025

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Mississauga Crescent

1. No Scheduled Disruptions at this time

Mississauga Road

1. Single and Two-Lane Closures

Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road. South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

—UPDATE—

Location:

  • Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road.
  • South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

Dates:

Friday May 16 to Friday May 30, 2025

Times:

8:00PM to 5:00AM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Mississauga Road

One lane closure of Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to and from Mississauga Crescent and Kedleston Way will be maintained at all times
  • No closures to occur on weekends
  • No closures to take place from Friday May 16 at 5:00AM to Tuesday May 20, 8:00PM
 

South Sheridan Way

Two-lane closure of South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road

  • 8:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • No Closures to occur on Weekends’
  • No closures to take place from Friday May 16 at 5:00AM to Tuesday May 20, 8:00PM

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

2. Full Ramp Closure and Single lane Closure

Mississauga Road between North Sheridan Way and South Sheridan Way

–UPDATE–

Location:

  • QEW Westbound On-ramp from Mississauga Road 
  • Mississauga Road North of the QEW Westbound on and off ramps at Mississauga Road

Dates:

Wednesday April 23 to Thursday May 22, 2025

Times:

Full Closure for Ramp

10:00PM to 5:00 for Mississauga Road

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound On-ramp at Mississauga Road
Full Closure of the QEW Westbound On-ramp from Mississauga Road

  • Wednesday April 23, at midnight until Thursday May 15, at 5:00AM

 

2. Mississauga Road North of the QEW Westbound on and off ramps at Mississauga Road

Single lane closure on Mississauga Road, North of the QEW Westbound on and off ramps at Mississauga Road

  • 10:00PM to 5:00AM
  • Scheduled Dates: Thursday May 08 to Thursday May 22
  • No closures to take place from Friday May 16 at 5:00AM until Tuesday May 20, 10:00PM
  • Two way traffic will be maintained at all times under flagging conditions

Impact:

  • Traffic Disruptions are anticipated.
  • Detour Signage will be in place.
  • Overnight Construction activities may cause noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

3. Full Ramp Closure

Mississauga Road between North Sheridan Way and South Sheridan Way.

Location:

QEW Westbound Off-Ramp to Mississauga Road

Date/Time:

Friday May 23 to Sunday May 25

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

  1. QEW Westbound Off-ramp to Mississauga Road

     Full Closure of the QEW Westbound Off-ramp to Mississauga Road

    • Saturday May 24, at midnight until Sunday May 25, at 5:00AM

 

  1. Mississauga Road between North of the QEW Westbound on and off ramps at Mississauga Road to North of Mississauga Crescent

     Alternating single lane closure on Mississauga Road, North of the QEW         Westbound on and off ramps at Mississauga Road to North of                         Mississauga Crescent

    • 9:00PM to 5:00AM
    • Scheduled Dates: Friday May 23 to Sunday May 25
    • Two way traffic will be maintained at all times under flagging conditions
  •  

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

4. One Lane Closure

Mississauga Road between North Sheridan Way and South Sheridan Way.

Location:

QEW Westbound Off-Ramp to Mississauga Road

Date/Time:

Sunday May 25 to Friday June 06, 2025

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Mississauga Road

One lane closure

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to/from North Sheridan way will be maintained at all times
  • No closures to occur on weekends
  •  

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

5. Two Lane Closure and Ramp Closure
QEW Westbound between Hurontario Street and Erin Mills Parkway. QEW Westbound Off-ramp to Mississauga Road.

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Westbound Off-ramp to Mississauga Road

Dates: Tuesday May 20 – Friday May 23, 2025

Times: 11:00PM to 6:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

  1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway 

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

 

  1. QEW Westbound Off-ramp to Mississauga Road

Full closure of QEW Westbound Off-ramp to Mississauga Road

  • Midnight to 5:00AM
  • Scheduled Dates: Friday May 23

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

North Sheridan Way

No scheduled disruptions at this time.

South Sheridan Way

1. Single and Two-Lane Closures

Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road. South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

—UPDATE—

Location:

  • Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road.
  • South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road.

Dates:

Friday May 16 – Friday May 30, 2025

Times:

8:00PM to 5:00AM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

Mississauga Road

One lane closure of Mississauga Road between Kedleston Way and QEW Westbound On-ramp from Mississauga Road

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to and from Mississauga Crescent and Kedleston Way will be maintained at all times
  • No closures to occur on weekends
  • No closures to take place from Friday May 16 at 5:00AM to Tuesday May 20, 8:00PM
 

South Sheridan Way

Two-lane closure of South Sheridan Way between QEW Eastbound On-ramp from South Sheridan Way and Mississauga Road

  • 8:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • No closures to occur on weekends
  • No closures to take place from Friday May 16 at 5:00AM to Tuesday May 20, 8:00PM

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

2. Single Lane closure

South Sheridan way between Gallant Drive and Indian Grove

 

–UPDATE–

Location:

South Sheridan Way between Gallant Drive and Indian Grove 

Dates:

Sunday May 11 – Wednesday May 21, 2025

Times:

8:00PM to 5:00AM

Purpose:

Ongoing QEW Credit River Improvement Project

Description:

South Sheridan Way

One lane closure of South Sheridan Way between Gallant Drive and Indian Grove (Monday to Friday)

  • 8:00PM to 5:00am
  • Two Way Traffic will always be maintained under flagging conditions
  • Access to Gallant Drive and Indian Grove will always be maintained
  • No closures on Saturday and Sundays
  • No closures to occur from 5:00AM on Friday May 16 to 8:00PM on Tuyesday May 20

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

3. Two Lane Closure and Ramp Closure

QEW Eastbound between Erin Mills Parkway and Hurontario Street. QEW Eastbound Off-ramp to South Sheridan Way.

Location:

  1. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  2. QEW Eastbound Off-ramp to South Sheridan Way

Dates: Thursday May 20 – Thursday May 22, 2024

Times: 10:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

 

  1. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mills Parkway to Hurontario Street. 

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

 

  1. QEW Eastbound Off-ramp to South Sheridan Way

Full closure of QEW Eastbound Off-ramp to South Sheridan Way.

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday May 22

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

5. One Lane Closure

South Sheridan Way between Gallant Drive and the QEW Eastbound Off-ramp to South Sheridan Way

Location: South Sheridan Way between Gallant Drive and the QEW Eastbound Off-ramp to South Sheridan Way

Dates: Wednesday May 21 to Friday May 30, 2025

 

Times: 8:00PM to 5:00AM

 

Purpose: Ongoing QEW Credit River Improvement Project

 

Description:

South Sheridan Way

One lane closure of South Sheridan Way between Gallant Drive and the QEW Eastbound Off-ramp to South Sheridan Way

  • 8:00PM to 5:00AM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Gallant Drive and Indian Grove will be always maintained
  • No closures on Saturday and Sundays

 

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

6. Ramp Closure
QEW Eastbound Off-ramp to South Sheridan Way

Location:

QEW Eastbound Off-ramp to South Sheridan Way

Dates: 

Wednesday May 28 to Tuesday June 03, 2025

Times: 

Midnight to 5:00AM

Purpose: 

Ongoing QEW Credit River Improvement Project

Description:

QEW Eastbound Off-ramp to South Sheridan Way

Full Ramp Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Wednesday May 28, Thursday May 29, Friday May 30, Monday June 02, and Tuesday June 03
  • No closures to occur on weekends

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

Kedleston Way

No scheduled disruptions at this time.

Knareswood Drive

No scheduled disruptions at this time.

Erin Mills

No scheduled disruptions at this time.