Traffic Impacts

We apologize in advance for any inconvenience or delays any traffic impacts may cause during construction on this important infrastructure project.  

Please plan ahead and drive according to the road conditions. Stay alert, stay safe, and slow down.

Click the road name under Impact Locations or scroll down for specific project traffic impacts.

Impact Locations

Marine Notification: Credit River Public Water Way

No scheduled disruptions at this time.

Multi-Use Path

No scheduled disruptions at this time.

QEW

1. Full Ramp Closure

Mississauga Road on-ramp to QEW Eastbound

Location:

QEW Eastbound on-ramp at Mississauga Road

Date/Time: Monday July 31, 2023 to TBD

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Full closure of the QEW Eastbound on-ramp at Mississauga Road.

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

2. Two Lane Closures and Ramp Closures

QEW Westbound & Eastbound between Erin Mills Parkway and Hurontario Street. QEW Eastbound Off-ramp to South Sheridan Way. QEW Eastbound On-ramp from South Sheridan Way. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  3. QEW Eastbound Off-ramp to South Sheridan Way
  4. QEW Eastbound On-ramp from South Sheridan Way
  5. QEW Westbound Off-ramp to Mississauga Road
  6. QEW Westbound On-ramp from Mississauga Road

Dates: Thursday October 30 to Friday November 14

Times: 10:00PM to 8:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway 

Monday – Thursday Nights

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

2. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mill Parkway to Hurontario Street  

Monday – Thursday Nights

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

3. QEW Eastbound Off-ramp to South Sheridan Way

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday November 13

4. QEW Eastbound On-ramp from South Sheridan Way

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday November 13 

5. QEW Westbound Off-ramp to Mississauga Road

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Friday November 14

 

6. QEW Westbound On-ramp from Mississauga Road

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Friday November 14

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

3. Two Lane Closures and Ramp Closures

QEW Westbound between Cawthra Road and Mississauga Road. QEW Eastbound between Erin Mills Parkway and Hurontario Street. QEW Westbound Off ramp to Hurontario Street. QEW Westbound On ramp from Hurontario Street. QEW Eastbound Off ramp to Hurontario Street.

—UPDATE—

Location:

  1. QEW Westbound between Cawthra Road and Mississauga Road
  2. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  3. QEW Westbound Off ramp to Hurontario Street
  4. QEW Westbound On ramp from Hurontario Street
  5. QEW Eastbound Off ramp to Hurontario Street

Dates: Tuesday November 18 to Sunday November 30

Times: 10:00PM to 7:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound between Cawthra Road and Mississauga Road

Tuesday November 18 to Thursday November 20

  • One Lane: 10:30PM to 6:00AM
  • Two Lanes: 11:00PM to 5:00AM

 

Friday November 21 and Saturday November 22

  • One Lane: 10:30PM to 7:00AM
  • Two Lanes: 11:00PM to 7:00AM

 

2. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mill Parkway to Hurontario Street  

Tuesday November 25 to Thursday November 27

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: 11:00PM to 5:00AM

 

Friday November 28 and Saturday November 29

  • One Lane: 10:30PM to 7:00AM
  • Two Lanes: 11:00PM to 7:00AM

 

3. QEW Westbound Off ramp to Hurontario Street

Full closure

  • Full closure from 11:00PM to 5:00AM on Tuesday November 18, Wednesday November 19, and Thursday November 20
  • Full closure from 11:00PM to 7:00AM on Friday November 21 and Saturday November 22

 

4. QEW Westbound On ramp from Hurontario Street

Full closure

  • Full closure from 11:00PM to 5:00AM on Tuesday November 18, Wednesday November 19, and Thursday November 20
  • Full closure from 11:00PM to 7:00AM on Friday November 21 and Saturday November 22

 

5. QEW Eastbound Off ramp to Hurontario Street

Full closure

  • Full closure from 11:00PM to 5:00AM on Tuesday November 25, Wednesday November 26, and Thursday November 27
  • Full closure from 11:00PM to 7:00AM on Friday November 28 and Saturday November 29

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

Premium Way

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday November 03 to Friday November 28

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Stavebank Road

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday November 03 to Friday November 28

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Dickson Road

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday November 03 to Friday November 28

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Hurontario Street

1. Two Lane Closures and Ramp Closures

QEW Westbound between Cawthra Road and Mississauga Road. QEW Eastbound between Erin Mills Parkway and Hurontario Street. QEW Westbound Off ramp to Hurontario Street. QEW Westbound On ramp from Hurontario Street. QEW Eastbound Off ramp to Hurontario Street.

—UPDATE—

Location:

  1. QEW Westbound between Cawthra Road and Mississauga Road
  2. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  3. QEW Westbound Off ramp to Hurontario Street
  4. QEW Westbound On ramp from Hurontario Street
  5. QEW Eastbound Off ramp to Hurontario Street

Dates: Tuesday November 18 to Sunday November 30

Times: 10:00PM to 7:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound between Cawthra Road and Mississauga Road

Tuesday November 18 to Thursday November 20

  • One Lane: 10:30PM to 6:00AM
  • Two Lanes: 11:00PM to 5:00AM

 

Friday November 21 and Saturday November 22

  • One Lane: 10:30PM to 7:00AM
  • Two Lanes: 11:00PM to 7:00AM

 

2. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mill Parkway to Hurontario Street  

Tuesday November 25 to Thursday November 27

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: 11:00PM to 5:00AM

 

Friday November 28 and Saturday November 29

  • One Lane: 10:30PM to 7:00AM
  • Two Lanes: 11:00PM to 7:00AM

 

3. QEW Westbound Off ramp to Hurontario Street

Full closure

  • Full closure from 11:00PM to 5:00AM on Tuesday November 18, Wednesday November 19, and Thursday November 20
  • Full closure from 11:00PM to 7:00AM on Friday November 21 and Saturday November 22

 

4. QEW Westbound On ramp from Hurontario Street

Full closure

  • Full closure from 11:00PM to 5:00AM on Tuesday November 18, Wednesday November 19, and Thursday November 20
  • Full closure from 11:00PM to 7:00AM on Friday November 21 and Saturday November 22

 

5. QEW Eastbound Off ramp to Hurontario Street

Full closure

  • Full closure from 11:00PM to 5:00AM on Tuesday November 25, Wednesday November 26, and Thursday November 27
  • Full closure from 11:00PM to 7:00AM on Friday November 28 and Saturday November 29

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

Lynchmere Avenue

1. Single Lane Closure

Premium Way between Stavebank Road and Lynchmere Avenue

Location:

  • Premium Way from Stavebank Road to Lynchmere Avenue

Dates: Monday November 03 to Friday November 28

Times: 9:00AM to 3:00PM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

Premium Way

One lane closure of Premium Way from Stavebank Road to Lynchmere Avenue (Monday to Friday)

  • 9:00AM to 3:00PM
  • Two-way traffic will be always maintained under flagging conditions
  • Access to Dickson Road and Lynchmere Avenue will be always maintained
  • No closures on Saturday and Sundays

Impact:

  • Traffic Disruptions are anticipated.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the date listed above.

Mississauga Crescent

No Scheduled Disruptions at this time

Mississauga Road

1. One Lane and Two-Lane Nightly Closure

Mississauga Road between Kedleston Way and QEW Westbound On-ramp at Mississauga Road. South Sheridan Way between Mississauga Road and QEW Eastbound On-ramp at South Sheridan Way.

—UPDATE—

Location:

  1. Mississauga Road between Kedleston Way and QEW Westbound On-ramp at Mississauga Road.
  2. South Sheridan Way between Mississauga Road and QEW Eastbound On-ramp at South Sheridan Way.

Dates: Thursday October 30 to Friday November 14

Times: 8:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. Mississauga Road

One lane nightly closure of Mississauga Road between Kedleston Way and QEW Westbound On-ramp at Mississauga Road

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to/from Mississauga Crescent and Kedleston Way will be maintained at all times

2. South Sheridan Way

Two lane nightly closure between Mississauga Road and QEW Eastbound On-ramp at South Sheridan Way

  • 8:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions

Impact:

  • Traffic Disruptions are anticipated.
  • No Closures to occur on weekends
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

2. Two Lane Closures and Ramp Closures

QEW Westbound & Eastbound between Erin Mills Parkway and Hurontario Street. QEW Eastbound Off-ramp to South Sheridan Way. QEW Eastbound On-ramp from South Sheridan Way. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  3. QEW Eastbound Off-ramp to South Sheridan Way
  4. QEW Eastbound On-ramp from South Sheridan Way
  5. QEW Westbound Off-ramp to Mississauga Road
  6. QEW Westbound On-ramp from Mississauga Road

Dates: Thursday October 30 to Friday November 14

Times: 10:00PM to 8:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway 

Monday – Thursday Nights

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

2. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mill Parkway to Hurontario Street  

Monday – Thursday Nights

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

3. QEW Eastbound Off-ramp to South Sheridan Way

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday November 13

4. QEW Eastbound On-ramp from South Sheridan Way

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday November 13 

5. QEW Westbound Off-ramp to Mississauga Road

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Friday November 14

 

6. QEW Westbound On-ramp from Mississauga Road

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Friday November 14

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

North Sheridan Way

No scheduled disruptions at this time.

South Sheridan Way

1. One Lane and Two-Lane Nightly Closure

Mississauga Road between Kedleston Way and QEW Westbound On-ramp at Mississauga Road. South Sheridan Way between Mississauga Road and QEW Eastbound On-ramp at South Sheridan Way.

—UPDATE—

Location:

  1. Mississauga Road between Kedleston Way and QEW Westbound On-ramp at Mississauga Road.
  2. South Sheridan Way between Mississauga Road and QEW Eastbound On-ramp at South Sheridan Way.

Dates: Thursday October 30 to Friday November 14

Times: 8:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. Mississauga Road

One lane nightly closure of Mississauga Road between Kedleston Way and QEW Westbound On-ramp at Mississauga Road

  • 10:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions
  • Access to/from Mississauga Crescent and Kedleston Way will be maintained at all times

2. South Sheridan Way

Two lane nightly closure between Mississauga Road and QEW Eastbound On-ramp at South Sheridan Way

  • 8:00PM to 5:00AM
  • Two-way traffic will be maintained at all times under flagging conditions

Impact:

  • Traffic Disruptions are anticipated.
  • No Closures to occur on weekends
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.

2. Two Lane Closures

South Sheridan Way between the QEW Eastbound On and Off ramps at South Sheridan Way to West of Indian Grove. QEW Eastbound Off-ramp to South Sheridan Way. QEW Eastbound On-ramp to South Sheridan Way.

—UPDATE—

Location:

  1. South Sheridan Way between the QEW Eastbound On and Off ramps at South Sheridan Way to West of Indian Grove

Dates: Thursday October 30 to Friday November 14

Times: 8:00PM to 5:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

South Sheridan Way

Two lane nightly closure of South Sheridan Way between the QEW Eastbound On and Off ramps at South Sheridan Way to West of Indian Grove

  • 8:00PM to 5:00AM
  • Two-way traffic will be always maintained under flagging conditions
  • No closure to occur on weekends
  • Access to the QEW Eastbound on and of ramps will always be maintained

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

3. Two Lane Closures and Ramp Closures

QEW Westbound & Eastbound between Erin Mills Parkway and Hurontario Street. QEW Eastbound Off-ramp to South Sheridan Way. QEW Eastbound On-ramp from South Sheridan Way. QEW Westbound Off-ramp to Mississauga Road. QEW Westbound On-ramp from Mississauga Road.

—UPDATE—

Location:

  1. QEW Westbound between Hurontario Street and Erin Mills Parkway
  2. QEW Eastbound between Erin Mills Parkway and Hurontario Street
  3. QEW Eastbound Off-ramp to South Sheridan Way
  4. QEW Eastbound On-ramp from South Sheridan Way
  5. QEW Westbound Off-ramp to Mississauga Road
  6. QEW Westbound On-ramp from Mississauga Road

Dates: Thursday October 30 to Friday November 14

Times: 10:00PM to 8:00AM

Purpose: Ongoing QEW Credit River Improvement Project

Description:

1. QEW Westbound Lanes

Two lane closure of QEW Westbound from Hurontario Street to Erin Mills Parkway 

Monday – Thursday Nights

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 6:00AM
  • Two Lanes: Midnight to 5:00AM

2. QEW Eastbound Lanes

Two lane closure of QEW Eastbound from Erin Mill Parkway to Hurontario Street  

Monday – Thursday Nights

  • One Lane: 10:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

Friday Night

  • One Lane: Midnight to 7:00AM
  • Two Lanes: Midnight to 6:00AM

Saturday Night

  • One Lane: 11:00PM to 8:00AM
  • Two Lanes: Midnight to 7:00AM

Sunday Night

  • One Lane: 11:00PM to 5:00AM
  • Two Lanes: Midnight to 5:00AM

3. QEW Eastbound Off-ramp to South Sheridan Way

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday November 13

4. QEW Eastbound On-ramp from South Sheridan Way

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Thursday November 13 

5. QEW Westbound Off-ramp to Mississauga Road

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Friday November 14

 

6. QEW Westbound On-ramp from Mississauga Road

Full Closure

  • Midnight to 5:00AM
  • Scheduled Dates: Friday November 14

Impact:

  • Traffic Disruptions are anticipated.
  • Overnight Construction activities may produce noise.
  • All closures are weather dependent.
  • Closure dates are subject to change and may not take place on all the dates listed above.
  • Signed detour will be set up for off-ramp closures.

Kedleston Way

No scheduled disruptions at this time.

Knareswood Drive

No scheduled disruptions at this time.

Erin Mills